Product Details:
|
Motor Power: | 21KW | Cooling Type: | Water And Fans |
---|---|---|---|
Control Type: | PLC | ||
High Light: | batch off cooling machine,batch off cooler |
Basic introduction of rubber cooling line
Main function of the unit is to cool rubber strip coming either from two-roll mill or from roller-calender and stacking of cooled rubber sheet on platette.
Features of Rubber cooling line
Rubber sheet comes into the batch-off unit entry (dip tank/soaking bath), where separation solution is applied, then is cooled in cooling tunell, captured by gripping equipment and pulled on the feeding conveyor. Feeding conveyor moves cooled rubber sheet through cutting equipment onto stacking equipment. Cooled rubber sheet is put on palette in wig-wag stacking or by plates. When given weight or height of stacked rubber sheet is achieved, full palette is replaced by empty one.
Parameter of rubber batch off cooling machine
Parameter/model | XPG-600 | XPG-900 |
Speed (m/min) | ~30 | ~40 |
Sheet thickness (mm) | 4-15 | 6-12 |
Sheet width (mm) | 600 | 800 |
Max capacity (kg) | 300 | 1500 |
Rubber hanging height (mm) | 1400 | 1400 |
Distance between hanging rod (mm) | 127 | 106 |
QTY of cooling fan | 12 | 18 |
Cooling fan power (KW) | 0.75 | 0.75 |
Cooling fan blowing capacity (m³/h) | 5300 | 5300 |
Rubber sheet temperature (ºC) | ≤40 | ≤40 |
Total power (KW) | 21 | 25 |
Weight (kg) | 5500 | 7500 |
Salient Features
Services Commitment
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.
Contact Person: LEE
Fax: 86-532-83197554