Product Details:
|
Product Name: | Open Type Mixing Mill Machine | Material: | Steel Casting |
---|---|---|---|
Working Length: | 1200 Mm | Motor Power: | 75kw,55kw |
Main Bearing: | Anti Friction Roller Bearings | Brakes: | Hydraulic Thruster Brakes |
Roll Cooling: | Complete Piping, Headers, Hoses Provided | NIP Adjustment: | Worm Gear With Parallel Sheeting Shaft |
Warranty: | 3years | Service Overseas: | Provision |
High Light: | open mill rubber mixing,rubber lab mill |
Product Description
SBR Rubber Mixing Machine for Efficient Rubber Compound Mixing Mill two roller
Model: XK-560
Application: The laborarory machines are an essential piece of equipment in the rubber and plastic processing industries.It plays an important tole in product quality control. The unit is ideal for experimentions with products during research and development, product improvement and color mixing thereby reducing production error to a minimum and saving production costs. This spelicallly designed laboratory machines from compact construction,low noise and safety. in addition,the machine is available to fir with a temperatute controller to ensure maximum temperature uniformity on the roller surface
Technical Parameter
Roll hardness | HRC 55~60 |
Roll diameter | Φ400mm |
Roll length | 1000mm |
Roll linear speed | 0~20m.p.m |
Roll speed | 0~40rpm |
Gap adjusting device | manual, 0.1~6mm |
Feeding quantity | 18~35kg |
Reducer | gear reducer |
Safety device | touch type of emergency stop |
Electric power request | 3ph~380V, 26A |
Photos:
Salient Features
Services Commitment
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.
Contact Person: lily
Tel: 008613061332206
Fax: 86-532-83197554